EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
-
HP Fuel Pump Assembly
-
Header tank
-
Header tank
-
Header Tank
-
Header Tank
-
Header Tank
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
-
Upper Cowling work;...
-
Cowling
-
Inspection panels
-
Prep for...
-
Cowling
-
Details
-
W & B
-
Fuel Flow test and...
-
Prep for W & B
-
Rear Windows and...
-
Doors
-
Air Intake Seal and...
-
Punch list
-
Ignition Coil and paint
-
Doors
-
Paint, Windshield...
-
Paint
-
Gap seals
-
Paint
-
Cowling
-
Wiring
-
Paint
-
Paint Prep
-
Doors
-
Cowling and Ignition
-
Ignition...
-
Engine run #2
-
First Engine Run
-
Cowling
-
Cowling
-
Cowling
-
Brakes, Prop,...
-
Cowling, trim tab
-
Engine
-
Details
-
Details
-
Rigging
-
Details
-
Various details
-
Rudder Cables
-
Rigging and final...
-
Rigging
-
Wingtips and ailerons
-
Flight controls and...
-
Skylight and flight...
-
Flight Controls
-
Elevator Trim and...
-
Elevator and...
-
Aileron and rudder...
-
Seats and Aileron...
-
Skylight and fairings
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Apr 30, 2024
Rear Windows and engine cables
- (2 hours)
Category: Reassembly
Sealed and installed rear windows. Worked on punch list from yesterday's Tech Counselor visit. Secured cables and wires in engine compartment. Added washer to right door hinge to lock into place, front to back.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.